Energy power siam thar, thli leh ni chakna hmanga entir hian power output inthlak danglamna leh rinhlelhna nasa tak a lantir a ni. Thli leh ni chakna chhuahna pahnih hi tualchhung khaw lum leh khaw vawt hian direct-in a nghawng a, power output spike emaw drop emaw a awm fo a, hei hian power system grid connection frequency-ah harsatna a siam a ni.

Power inthlak danglamna leh grid impedance characteristics complex tak tak avang hian large-scale centralized grid connection emaw random power output emaw awm dan pangngaiah chuan power oscillations a awm thei a, hei hian power system stability chungchangah harsatna a thlen thei a ni. Hei hian load leh hmun zau takah energy siamchhuahna system thar ruahmante performance a nghawng a, hei hian energy source thar inzawmkhawm theihna a nghawng loh nan system-ah reserve capacity tling a mamawh a, hei hi planning leh economic efficiency pahnih tihhlawhtlinna atana pawimawh tak a ni.
Energy dahkhawmna leh energy source thar inzawmkhawmna hian thil pathum a ngaihtuah ber a ni: Pakhatnaah chuan, hun rei lote chhunga grid-level loads chhuahtir hian power grid-a minute 10-level power regulation a siam thei a, hun rei lote chhunga inthlak danglamna a tiziaawm a, grid awmsa chu a thar nena inzawm theihna chu a hmang tangkai vek a ni chakna chhuahna hmun a ni. Pahnihnaah chuan, minute-level plan siamin, energy output forecast thar te pawh a tel a, short-term day-ahead power generation forecasts atanga chhut chuan, ultra-short-term power forecast-ah energy source thar te chu a taka a dah tel a ni. Hei hian grid chhunga generating unit hrang hrangte rational operation leh scheduling a ti \\ha a, rapid frequency regulation resources mamawhna a ti tlem a, grid forecast dik leh nghet zawk a tipung a, energy source thara minute-level real-time fluctuation te chu a ti awlsam a, conventional generating unit-te normal operation-a nghawng a neih chu a ti tlem hle.
Peak Shaving leh Valley Filling te a awm bawk
Power generation pangngai nena khaikhin chuan renewable energy generation hian a hmanrua emaw unit emaw hmanna rate a nei tlem hle. Ka ram "Three Norths" bial hi entirnan la ila, thlipui resource statistics atanga a lan dan chuan thlipui siamna hmun pakhatin a installed capacity zawng zawng atanga 60% aia tam a chhuah theihna chance chu a tlangpuiin 5% aia tlem a ni. Line hman dan tihchangtlun nan line capacity planning hian a tlangpuiin thli hmanga power transmission mamawh 95% emaw, thli hmanga farm-a installed capacity zawng zawng 60% emaw phuhruk a tum a ni. Photovoltaic tan chuan thil awmdan hi a na zawk hle. Chuvangin, thli chakna percentage engemaw zat chu transmission capacity tling lo vangin tihtlem a ni ang a, ni zung chakna pawh load inmil lohna (anti-peak-shaving characteristics) avangin tihtlem a ni ang.
Renewable energy siamchhuahna, nitin darkar khata hun rei tak-a inthlak danglamna te, tlai lama electric mamawhna sang ber (a tlangpuiin 7-10 PM) a lo thlen chuan system-in a sang leh hnuai lam a mamawh a tipung ang. Thli chakna erawh chu zanlai vel, load chu ni khata a hniam ber lai a nih laiin full output a thleng fo thin. Chuvangin, renewable energy siam chhuah tur ruahmannaa rinhlelhna awmte tihbo nan power grid leh conventional generating unit pahnih hian deep peak shaving nena inzawm risk lian tak tak an phur a ngai a ni.
Peak shaving leh valley filling hian energy storage-a time-shifting characteristics hmangin line transmission capacity a ti sang a, load trend nena inmil tura mamawhna a ti tlem a, conventional generating unit atanga capacity tihpun leh tihhniam mamawhna a tihziaawm bawk.
Nitin load curve pek P_l chu renewable energy siam chhuahna output curve P_{NE} nen kan belhkhawm chuan final system equivalent load curve ∑P_i, chu chu ∑P_i=P_l - P_{NE} kan hmu thei a ni. Mahse, conventional power plant leh peak{11}}shaving power plant-te output regulation range ngaihtuah chuan, leh regional interconnection line-in external grid-a a thawn chhuah theih emaw, a hmuh theih emaw power P_L sang ber ngaihtuah chuan, grid-connected unit-a power effective ber P_{max} chu:
P_{max}=μ(P_f + P_b + P_L) (3-3) a ni.
Khawnge:
in pawn lama i hmuh theihna hmun awmchhun
- P_f-Peak-shaving unit-te output power sang ber;
- P_b-Peak shaving-a tel thei lo unit-te output tlem ber;
- μ-Grid transmission leh hman tangkai dan tur.
Formula-ah chuan C hian peak-shaving unit-a output power regulation coefficient a entir a. Power inzawmnate chu figure-ah hian tarlan a ni.

Grid-connected unit-te effective power P_{min} tlem ber chu:

Load period hniam ber t1–t2 chhung hian, conventional peak-shaving unit-te’n downward regulation capacity an reserve chu he hun chhunga grid-in a pawm theih renewable energy power P’_{NE} sang ber a ni a, chu chu P’{NE}=P{max} - P_{min} (3-5) a ni a, chutah chuan P_{min} chu nitin output tlem ber a ni (energy dahkhawmna tel lo chuan t1–t2 chhunga renewable energy siamchhuahna chu thli/ni tihtlem hmang chauhvin a thleng thei).
Energy dahkhawmna tel lo chuan t1–t2 chhunga renewable energy output chu a tlem thei chauh tih hmuh theih a ni a; mahse, energy storage nen chuan t1–t2 chhunga charge leh t3–t4 chhunga discharge hian effective equivalent load curve ∑P_i chu P_{min} leh P_{max} inkar ah a shift a, renewable energy output limitation leh wind/solar curtailment te a pumpelh a, renewable energy absorption capacity a ti tha a, grid-in reserve a mamawhna a ti tlem a ni capacity, leh system pumpui efficiency tihchangtlun a ni. BESS (Battery Energy Storage System) pakhat chakna P_{BESS} chu:
P_{BESS}=max( P_{min} - ∑P_{min}, ∑P_{max} - ∑P_{max} ) (3-6)
BESS pakhata energy E_{BESS} chu:
E_{BESS}=max{ μ_c ∫{t1}^{t2} (P{min} - ∑P_i) dt , 1/μ_d ∫{t3}^{t1} (∑P_i - P{max}) dt } (3-7)
Khawnge:

- μ_c -- Energy dahkhawmna system-a charge efficiency;
- μ_d -- Energy dahkhawmna system-a discharge efficiency.
A zau zawka zirchianna neih belh chuan load peak leh valley rei tak tak te tan chuan energy storage system capacity engemaw zat configure hian peak-valley danglamna chu nasa takin a tihziaawm thei tih a tarlang a, hei hi figure-a kan hmuh ang hian a ni.
Load peak-valley danglamna tihchangtlunna level chu:

- Khawiah nge Pimaxchu load beisei sang ber a ni a;
- Pimaxchu load beisei tlem ber a ni.
Energy storage system configuration dan hi a hmaa kan tih tawh nen a inang a, tih leh a ni tawh lovang.
Prediction dikna tihchangtlun
NBT32011-2013 "Technical Requirements for Power Prediction System of Photovoltaic Power Station"-in a tarlan dan chuan, photovoltaic power station-a power siam chhuah hun chhung (output tlemte nei hun chhung tel lovin) hun rei lote chhunga prediction-a root mean square error chu 0.15 aia tlem a ni tur a ni a, thla tin pass rate chu 80% aia tam a ni tur a ni ultra-short-term prediction darkar li chhunga root mean square error chu 0.1 aia tlem a ni tur a ni a, thla tin pass rate chu 85% aia tam a ni tur a ni.
"Interim Measures for the Administration of Wind Farm Power Forecasting and Early Warning" ang chuan, thlipui siamna hmuna nitin forecast curve-a error sang ber chu 25% aia tam a ni tur a ni lo va, real-time forecast error chu 15% aia tam a ni lo tur a ni a, ni khat chhunga forecast-a root mean square error chu 20% aia tlem a ni tur a ni.
Short-term leh ultra-short-term forecast pahnih hian minute 15 chhunga forecast data an pe vek a ni. Chuvangin, energy source thar output chu minute 15 chhungin segment leh control theih a ni a, nitin control segment 96 a awm thei a ni. Control error bandwidth phalna ΔP chu forecasting technical specification kaihhnawih a error phalna sang ber atanga siam a ni. Figure 3-8-a kan hmuh angin P(1) leh Pe(2) te hi minute 15 inkar hmasa leh pahnihna atana power value ruahman a ni a, AP erawh chu allowable error bandwidth a ni a, energy thar power siam chhuahna installed capacity 15%-ah dah a ni thung.

Energy thar siam chhuahna hun rei lote chhunga variation smoothing
Energy thar siam chhuahna inthlak danglamna hun rei lote- hian power system stability atana thil tulte pawh a tlin tur a ni. Energy grid thar-connected power generation thara active power variation atana power grid limit awm mek chu a hnuaia table-ah hian tarlan a ni.
Table 3-2: Grid-a Connected-a Energy Power thar siam chhuahna atana Active Power Change-a tihkhawtlai
| Energy Power Station thar (MW)-a dah theihna (installed Capacity) chu 1.1. | Minute 10 (MW) chhunga Active Power inthlak danglamna tam ber . | Minute 1 (MW) chhunga Active Power inthlak danglamna tam ber . |
|---|---|---|
| < 30 | 10 | 3 |
| 30 ~ 150 | Installed theihna / 3 | Installed theihna / 10 |
| > 150 | 50 | 15 |
Renewable energy smoothing application-ah chuan BESS (Power Equipped Element System) hi renewable energy power generation dahkhawm leh chhuah nan hman a ni a, hei hian renewable energy grid-connected system-a minute-level power inthlak danglamna chu a titawp a ni. Hei hian energy storage PBEss (Power Element System) leh renewable energy Pv (Power V) te combined output P fluctuation te chu a chunga kan sawi tak technical requirements te chu a tlin theih nan a tichiang a, control time interval chu a tam zawk chu minute 1 ah dah a ni. Mahse, prediction dikna tichangtlungtu algorithms ang lo takin, he approach hian a bul berah chuan renewable energy output-a power fluctuation-te a ngaihtuah ber a ni. Chuvangin, BESS-a specific rated power thlannaah chuan statistical analysis leh probability analysis atana data sample source chu renewable energy output-a minute-level leh minute 10-minute-level active power inthlak danglamna a ni ang.
BESS-a power leh capacity design hi tun hmaa power inthlak danglamna probability statistics leh power consumption-a inthlak danglamna cumulative-a innghat a la ni thei a, 80% atanga 90% vela smoothing mamawh phuhruk tum a ni. Hei hi hetah hian sawi nawn leh a ni lovang. Power fluctuation range hian a chunga thil tulte a tlin theih nan BESS power control algorithms lian pahnih hman a ni a:
- Pakhat chu point-by-point limiting method a ni a;
- A dang chu low-pass filtering method a ni.
Point-by-point limit dan hmangin

Figure hi entirnan la ila, figure hian energy output thar P te khaikhinna lian tak a tarlang a nine(j) hun j-ah leh minute 10 kalta chhunga output P(J-n) inzawmkhawm. Hun (j-3)-ah, chu chu P(j-3) leh P inkara inthlak danglamna a ni tih a hriat theihne(j) hi a lian ber a, minute 10 aia tam a ni. A tehkhin dan chuan △P10.
Chuvangin, minute 10 chhunga power fluctuation limit tlin theih nan BESS output range (charge atan positive, discharging atan negative) chu:

Low-pass filtering hman dan
Signal processing-a filtering principle hmangin, figure-a kan hmuh angin, low-pass filter hian input signal amplitude a belh emaw, a paih emaw hmangin output signal chu a ti awlsam zawk a ni. Chutiang bawkin BESS hman theihna hian energy power station thara output power inthlak danglamna chu a charging leh discharging control hmangin a ti awlsam thei bawk ang a, chutiang chuan technical requirement kaihhnawih te chu a tlin theih nan a ni.

Grid-connected power zawng zawng ∑P\\sum P∑P atanga beisei zat chu hetiang hian pek a ni:
Data chu discretize la, t chu control period a ni a, minute 1 kan la ang:
∑P(j)=(τ / (τ + t)) * ∑P(j-1) + (t / (τ + t)) * P_ne(j) .
A rilru a buai em em a, a rilru a hah em em bawk a. ∑P(j)=P_ne(j) - P_bess(j) .
P_bess(j)=(τ / (τ + t)) * (P_ne(j) - ∑P(j-1)) .
P_bess(j)=(τ / (τ + t)) * (∑P(j) - ∑P(j-1)) .
Grid-connected power fluctuation technical requirements ang chuan minute-level fluctuation range ∑P(j) chu a satisfy tur a ni:
|∑P(j) - ∑P(j-1)| min(ΔP_i, 0.1 P_0) aia tlem emaw, a tlukpui emaw a ni.
P. aiah calculation formula thlak a nibess a ni(j) kan hmu a: